The last pipe of the two strings of the Nord Stream 2 gas pipeline has been welded into place, the operator said on Monday, 6 September.
The post Nord Stream 2: Last pipe welded into place appeared first on Offshore Energy.
The last pipe of the two strings of the Nord Stream 2 gas pipeline has been welded into place, the operator said on Monday, 6 September.
The post Nord Stream 2: Last pipe welded into place appeared first on Offshore Energy.